“We are constantly serving our customers with our best products.” Having accumulated cherished encounter in cooperating with overseas customers, EPG has established up a complete set of high quality management method which is offered with advanced inspection and examination products. Qt8-15 Tiger Total EPTT EPT Concrete CinEPTTBlock cement brick generating EPTT with German EPTT
QT8-fifteen Block generating EPTT is 1 of our sizzling sale block producing EPTT which can generate all kinds of hollow blocks, solid block, paver, curbstone and so on. In orEPTTto suit the overEPTT markets and make sure the EPTT work higher efficiency, we are continuously updating and bettering the high quality and EPT.,the EPTT advantages are as proven subsequent.
Introduction:
one. four vibration motors: Our vibration program adopts 4 vibration motors,vertical vibration on to 4 corners of the system,vibration evenly powerful and rapidly,molding quick,decrease the friction with the mildew,lengthen the service life of the mold.
2. Lengthened vibration shaft and vibation box: We undertake lengthened vibration shaft and vibation box to make the vibration platform vibrate stably with a lot more powerful and less noise.Our vibration box is cast,will not leak oil.
3.EPT PLC and vibration motors: Adopts EPT PLC and vibration motors to make positive our EPTT operate far more effectively and stably.
four. Japan YUKEN EPT component: EPT program adopts the YUKEN proportional valve and multi route communication management system,which can change any actio in al course to make our EPTT operating much more steady and delicate.
five.Block mould:Use manganse steel content,with the liner slicing and warmth treatment EPT,increase 50%provider lifestyle.
six.EPT Feeder: Adopt German EPT wich uses a swinging spline shaft,makes the uncooked materials evenly into the mildew,reducing ther error of the brick,and this program has a minimal falure price.
Principal specialized parameter
1 | Dimension of host EPTT | 5300*1700*2700mm |
2 | Excess weight of host EPTT | ten.5T |
3 | Shaping cycle | 12-20s |
four | Water intake | 7-10T / change |
five | workshop region | 300m2 |
6 | Host EPTT EPTT | 44.2KW |
7 | Vibration power | 80-100KN |
eight | Mixer model | JS750 |
nine | Pallet measurement | 960*850mm |
10 | Voltage | 380/415/440V a few section |
Theoretical creation capacity | ||||||||
No | Dimensions(LxWxH) | Reference pic | Pcs/EPT | Pcs/Hour | Pcs/Change | |||
one | 400x200x200mm | eight | 1440-1680 | 11520-13440 | ||||
2 | 400x100x200mm | 16 | 2880-3360 | 23040-26880 | ||||
3 | 400x150x200mm | 10 | 1800-2100 | 14400-16800 | ||||
4 | 400x250x200mm | eight | 1080-1260 | 8640-10080 | ||||
five | 230x110x70mm | Strong brick | 45 | 8100-10800 | 64800-86400 | |||
6 | 200x100x60 | 27 | 5760 | 46080 | ||||
seven | 200x163x60 | 18 | 3600 | 28800 |
Our service
1. In the approach of equipment generation, we examine the top quality of tools generation at any time, carry out ex-manufacturing facility testing ahead of shipment to ensure merchandise top quality.
2. Send out our engineers to XiHu (West EPT) Dis.Hu (West EPT) Dis. consumers in set up and commissioning.
three. Free of charge provide of spare components and tools that enough1 for one particular year.
four. The guarantee period is a single year. For any good quality issues for the duration of the warranty period of time, our business will repair or exchange spare elements totally free of cost.
5. Our business has been worked for twenty five years. We can be discovered at any time.