Electrical power UNITS FOR DOUBLE-SCISSORS LIFT

Standard Description
Outfitted with all the zero leak bidirectional checking sole-noid valves, this power unit is created for your operation of two independent circuits. Which are respectively for your principal and subordinate platforms from the double scissors lift. Two cut-off valves are used for lowering the machine manually in situation of power loss. If much more independent circuits are necessary for the application please get in touch with us for availability.
Remark: one. Please consult our income engineer to the various pump displacement, motor power or tank capability.
2. CSA or UL certified motors can be found on request.
Unique Notes
1. The AC motor is of S3 duty cycle, which can only do the job intermittently and repeatedly, i.e., 1minute on and 9 minutes off.
2. Clean the many hydraulic parts concerned just before installation of the energy unit.
3. Viscosity from the oil shoud be 15~46 cst,plus the oil ought to be clean and free of charge of impurities,N46 hydraulic oil is suggested.
four. The energy unit should be mounted vertically.
5. Check the oil degree from the tank immediately after the original running on the electrical power unit.
six. Oil transforming is required following the original a hundred operation hours,afterwards the moment just about every 3000 hours.